Atomic job upgrades

The classic job upgrade flow is a six-step manual pipeline: stop the Job, wait for convergence, take a savepoint, wait for it to complete, submit the upgrade, start the Job again. Every step is operator latency, and the Job sits stopped between them.

The atomic mode performs the same sequence behind one API call:

POST /api/v1/jobs/{id}/upgrades
{
"mode": "atomic",
"spec": { ...new JobSpec with a strictly greater version... },
"expected_generation": 7
}
→ 202 { "upgrade_id": "job-upgrade-12", "state": "saving_savepoint", ... }

The Hub orchestrates the phases below and returns 202 immediately. The Job keeps processing during the savepoint; the stop-the-world window shrinks to the savepoint-plus-restore interval. The stopped mode remains available and unchanged for planned maintenance.

Phase machine​

saving_savepoint ──▶ committing_version ──▶ verifying ──▶ succeeded
│ (retries/d deadline) │ (deadline / no convergence)
▼ ▼
aborted rolling_back ──▶ rolled_back
│ (restore fails / no convergence)
▼
failed
PhaseWhat happensDefault deadline
saving_savepointDispatches a savepoint at the current generation through the ordinary checkpoint path. Failed rounds are retried up to 2 times; exhaustion or deadline aborts with the Job untouched and still running.5 minutes
committing_versionONE generation-fenced write commits the new spec with desired_state = running. The recovery pointer is not written — it already references the just-completed savepoint, and the fenced write preserves it.1 minute
verifyingOrdinary reconciliation starts the new generation (which also stops the old one). The orchestration observes until the Job is running at the target version.10 minutes (verify_timeout_ms request override)
rolling_backThe previous version is restored from the SAME savepoint through the same fenced write; reconciliation restarts it. Terminal failed leaves the Job stopped with its recovery pointer intact for manual action.10 minutes

Phase transitions are broadcast as job.upgrade events on GET /api/v1/events/stream, and operator actions are audited (job.upgrade.atomic.initiate/pause/resume/cancel/rollback).

Replay semantics​

A checkpoint-mediated cutover is not lossless duplication-free for every sink: events processed by the old generation after the savepoint barrier are replayed by the new generation from the savepoint's source positions.

  • Transactional sinks: exactly-once (the replayed events are deduplicated by the sink transaction).
  • Non-transactional sinks: at-least-once. The duplication window is bounded by the savepoint-to-cutover interval, which the orchestrator minimizes by committing in the same reconcile tick in which the savepoint completes.

Orchestration ownership and conflicts​

While an orchestration is non-terminal, the Job is fenced: the general reconciler defers re-placement during the savepoint, commit, and pause phases (a re-placement would bump the generation the savepoint dispatch is keyed to), and job-level mutations are rejected with 409 orchestration_in_progress:

  • PUT /jobs/{id}/desired-state
  • POST /jobs/{id}/actions/{start|stop|restart}
  • further upgrades (atomic or stopped mode) and manual version rollback

The observation phases (verifying, rolling_back) deliberately let ordinary reconciliation run — it is the start mechanism there.

Checkpoint retention never deletes an artifact an active orchestration references; the pin is released when the orchestration reaches a terminal state.

Status and actions​

GET  /api/v1/jobs/{id}/upgrades/{upgrade_id}      → phase, savepoint, deadline, last error
POST /api/v1/jobs/{id}/upgrades/{upgrade_id}/actions {"action": "pause"|"resume"|"cancel"|"rollback"}
  • pause freezes the orchestration; resume re-arms the phase deadline. Pausing during the savepoint phase leaves the old version running, but pausing mid-verification can freeze a Job in the cutover gap (old version already stopped, new one not yet started) until resume. A long pause also stretches the replay window — prefer cancelling and starting a fresh upgrade instead.
  • cancel releases the Job (a verification-phase cancel leaves the new version converging on its own; ordinary reconciliation continues it).
  • rollback is available once the orchestration is verifying.

Hub restart and failover​

Orchestration phase, deadline, and savepoint reference are durable (cp_job_upgrades). A Hub that starts or gains leadership with a non-terminal orchestration resumes it idempotently: a savepoint phase dispatches a fresh round after the lost command settles, a commit phase applies the conflict-interpretation rule (an already-applied commit advances; anything else aborts), and the observation phases continue watching. Nothing is re-applied blindly — idempotency is judged against the Job's observable state, never the phase row.

Console​